Our Completed Projects

Our Projects

Oaklands Crossing Grade Separation

Ausdig has had the privilege to work with the PTP Alliance on the Oaklands Crossing Grade Separation. The $274 million dollar project is jointly funded by the Australian Government, the State Government and the City of Marion.


At Ausdig, we are proud to play a part in a development that will decrease traffic congestion and travel time for all commuters, and further improve safety for all.

Plans to remove the level crossing and lower the rail line, will aim to improve safety for vehicles and pedestrians, as well as increase the number of commuter car parks.

Ausdig-Oaklands-Crossing-Grade-Separation-1-Australia

Ausdig has proudly contributed to the progression of the project through excavation work.

Highly competent operators, have undertaken the bulk dig, final trim and detailed excavation, using our GPS integrated excavators. Ausdig have supplied the Base Station for the project along with the GPS repeaters to get the signal down deep into the cut.

This technology allows for a clean and accurate finish within 15mm to 30 mm to the final trim.

Ausdig-Oaklands-Crossing-Grade-Separation-2-Australia
Ausdig-Oaklands-Crossing-Grade-Separation-3-Australia
Ausdig-Oaklands-Crossing-Grade-Separation-4-Australia

Our Prolec height/slew limiter systems were used to ensure the highest standards of safety available to the project when working under the bridge, under and above live services and alongside live traffic.

Ausdig-Oaklands-Crossing-Grade-Separation-5-Australia
Ausdig-Oaklands-Crossing-Grade-Separation-6-Australia

As seen, our Rammer 555 and 1533 rock breakers are being used on the project for breaking piles, concrete and bitumen.


Ausdig has used the PD25 auger drive to undertake the augering 1200ml holes to 4-6m deep.

Ausdig-Oaklands-Crossing-Grade-Separation-7-Australia

Workforce Participation

Ausdig believes in increasing employment opportunities and skill development opportunities for Aboriginal peoples, trainees and apprentices, and local people with barriers to employment. We believe in providing opportunities for training to better our employee’s knowledge and experiences on the job and for future jobs.


Through this, we work with the PTP Alliance on the project to complete monthly Workforce Participation Reports, helping to meet targets and identify future goals and improvements.

Ausdig-Oaklands-Crossing-Grade-Separation-8-Australia
Ausdig-Oaklands-Crossing-Grade-Separation-9-Australia

Torrens 2 Torrens Project

Ausdig has had the privilege to be a part of the Torrens 2 Torrens Project, working with the T2T Alliance and many other sub-contractors.

Ausdig has played a huge role in the delivery of a 4km non-stop roadway. Here at Ausdig we are proud to be a part of such a large development in Adelaide, that will benefit the Adelaide community through significantly saving travel time for both commuters and freight.

Throughout the duration of the project, Ausdig has played an important role in the progression of the Torrens 2 Torrens through extensive excavation jobs across the entire roadway.

Ausdig has proudly completed a large sum of the main dig on the Torrens 2 Torrens project using our GPS integrated systems.

Using their fully integrated total station run LPS systems, Ausdig operators have been able to complete the final trimmings on the project.

This new technology allows for a clean and accurate finish within 5-10mm to the final trim, of the 1 in 40 batter.

Ausdig is working with the T2T to increase employment opportunities and skill development opportunities for Aboriginal people, trainees and apprentices, and local people with barriers to employment.

We believe in providing opportunities for training to better our employee’s knowledge and experience on the job and for future jobs. In doing so, we assist the T2T with monthly Industry Participation Reports, which helps us to meet targets and identify future goals and improvements.

Ausdig-Torrens-2-Torrens-Project-1-Australia
Ausdig-Torrens-2-Torrens-Project-2-Australia

Our Role

Some of Our Work

Ausdig-Torrens-2-Torrens-Project-3-Australia
Ausdig-Torrens-2-Torrens-Project-4-Australia
Ausdig-Torrens-2-Torrens-Project-5-Australia

Gateway South - Darlington Upgrade Project

Ausdig has had the privilege to be a part of the Darlington Upgrade project, working with Fulton Hogan, Lainge O’rourke and other major companies.


The Darlington Upgrade Project is a jointly funded project by the Australian and State Government, which will deliver Adelaide’s North-South Corridor as well as an upgrade of approximately 3.3 kilometres of the existing Main South Road. 


This will include:


  • A non-stop motorway between the Southern Expressway and Tonsley Boulevard
  • A lowered, non-stop motorway passing underneath Flinders Drive, Sturt Road, Sutton Road/Mimosa Terrace and Tonsley Boulevard
  • Grade separation of the Main South Road/Ayliffes Road/Shepherds Hill Road intersection
  • Main South Road (at grade) surface roads along both sides of the lowered motorway to provide connections to Flinders Drive, Sturt Road and most local roads
  • Full free flow interchange at the Southern Expressway/Main South Road with dedicated ramps providing direct access to the new motorway and Main South Road

Ausdig-Gateway-South-Darlington-Upgrade-Project-1-Australia

2017, The Department of Planning, Transport and Infrastructure, Darlington Upgrade Project, viewed March 2018

Our Role

Throughout the duration, Ausdig has contributed to the progress of the Darlington Upgrade Project, through extensive excavation jobs.


Ausdig’s highly competent operators have undertaken bulk earthworks, pile cropping, rock breaking and a number of detailed excavation works using their fully integrated GPS Guided excavators and rockbreakers. This technology allows for a clean and accurate finish within 30 mm to the final trim.

At the beginning of the project, Ausdig provided full night work crews, of operators, labourers, supervisors and machinery to help the project get underway.

Ausdig-Gateway-South-Darlington-Upgrade-Project-2-Australia
Ausdig-Gateway-South-Darlington-Upgrade-Project-3-Australia

Workforce Participation

Throughout the duration, Ausdig has contributed to the progress of the Darlington Upgrade Project, through extensive excavation jobs.


Ausdig’s highly competent operators have undertaken bulk earthworks, pile cropping, rock breaking and a number of detailed excavation works using their fully integrated GPS Guided excavators and rockbreakers. This technology allows for a clean and accurate finish within 30 mm to the final trim.

At the beginning of the project, Ausdig provided full night work crews, of operators, labourers, supervisors and machinery to help the project get underway.

Ausdig-Gateway-South-Darlington-Upgrade-Project-4-Australia
Ausdig-Gateway-South-Darlington-Upgrade-Project-5-Australia
Ausdig-Gateway-South-Darlington-Upgrade-Project-6-Australia

Providing earthmoving services and plant hire for every project.

© 2020 Ausdig

|

Powered and built by iSeekplant.com.au

For a free quote, call us on (08) 6245 0315 or fill out the form below.

  • Earthmoving Services
  • Earthmoving Equipment Hire
  • Excavator Attachment Hire

Request a quote and one of our hire specialists will be in touch with you as soon as possible.

SKID STEER LOADER HIRE

Don't want to wait, give us a call on (08) 6245 0315.

template image

Request a quote and one of our hire specialists will be in touch with you as soon as possible.

DOZER HIRE

Don't want to wait, give us a call on (08) 6245 0315.

template image

Request a quote and one of our hire specialists will be in touch with you as soon as possible.

ARTICULATED DUMP TRUCK HIRE

Don't want to wait, give us a call on (08) 6245 0315.

template image

Request a quote and one of our hire specialists will be in touch with you as soon as possible.

BACKHOE HIRE

Don't want to wait, give us a call on (08) 6245 0315.

template image